24 -hour operation of aircraft from today at Lucknow Airport; Eight flights will increase, passengers will get relief - Flight operations at Lucknow Airport will start 24 hours from today. 8 flights will increase. Passengers will get relief
Flight services are available 24 hours from Saturday at Lucknow Airport. After upgrading the runway and setting up new taxi road, the ban on flights will be lost. It will also recover canceled flights. 28 domestic and 8-10 international flights work at the airport. The runway will also be expanded for which the land will be acquired. This will enable large aircraft to land and direct flights will begin. Flight services are available 24 hours from Saturday at Chaudhary Charan Singh International Airport. Jagran Correspondent, Lucknow. Flight services are available 24 hours from Saturday at Chaudhary Charan Singh International Airport. After the top of the Lucknow Airport runway, the construction of two new taxiways, the four-hour ban on flights is withdrawn from Saturday. It will also recover eight flights running from March 1. Lucknow Airport is currently closed for the aircraft operation from 11 to 15 hours. This is the same time when domestic flights are asked at long distance. As of March 1, the reactions of the 2,744 meter -long runway began. The lighting system is also replaced. There are currently five taxis at the airport, while two more new taxis are ready. In the busy time, more aircraft will be able to move to the new taxis to go from Epion to runway. It will also significantly reduce the possibility of deadliness of aircraft in the busiest time. The airport currently operates 128 flights for 28 domestic destinations per day. In addition, eight to ten international flights are also operated. Some flights between 11 and three in the afternoon have been rescheduled, which can now change the time. With the completion of this work, the runway of the airport became safer for running flights. According to airport officials, the runway at Lucknow Airport will also be expanded soon. The district administration sought an income record for the acquisition of 54 hectares of land of five towns against Bijnor. Airport and district administration will do joint surveys. After this survey, the runway will be expanded as soon as the land is obtained. This can also end up at the airport to start direct flight services for many cities in the US and Britain. At present, the length of the runway is short for these large aircraft. The length of the runway will be increased to 3.500 meters.