Pelindo revealed traffic jams in Priok due to 3 loading and unloading ships outside the schedule
Jakarta – Horror traffic jams occurred yesterday (4/17/2025) in Tanjung Priok, North Jakarta. Pelindo explained the cause of congestion due to loading and downloading at the port of Tanjung Priok. Drajat Sulistyo, PT Pelindo’s local executive director 2, said there was an increase in the amount of loading and downloading at the new Priok Container Terminal (NCPT) port. Increased loading and downloading occurred because there had to be three ships anchored outside the schedule. “The increase in volume is dominated in one terminal, namely the name NPCT 1, NPCT 1, the arrival of the ship that was supposed to come a week ago,” Drajat said Friday (18/4). Browse to continue with the content “There are three ships that dock, the name of the ship MSC Adu v, ever delicious, and another Venus star, these three ships are indeed ships that were supposed to be two last week, the other should have come 24 hours before,” he explained. According to him, the three ships trapped outside the specified schedule. As a result, the presence of the three ships contributes to the volume loading and downloading at the NPCT port 1. “With the impact of the ships not determined at a time or in a time not supposed. Time is for ships that are not supposed to do, not in the window. Of course, the density at the port has an impact on traffic on the road, especially those leading to Tanjung Priok. “It was together so that our terminal could eventually order about 4,200 containers that had to be released. Which had to be 2500 capabilities that were released 4200. 2025 Read the inspirational story of the exemplary police candidate here