The road built 1 month ago couldn't even resist 1 rain ... 10 feet of pit in Gwalior blew senses!

Last updated: June 20, 2025, 11:36 AM The road from Chetakpuri to the city center in Gwalior collapsed in the first rain. A 10 -feet pit was formed on the road and the water pipeline also burst. Know the whole thing that emphasizes the road in the rain, the new road in Gwalior, sank in the first rain. 10 feet deep on the road, traffic jam. Water supply influenced by the water pipeline Burst. Sushil Kaushik, Gwalior: Once the first rain fell in the city, the quality of the construction of the road opened. The newly built road from Chetakpuri to the city center, prepared just a month ago, was scared in the first rain. A 10 foot deep pit and a large traffic jam in the middle of the road. The road built on the ground is now suffering people, the locals say that the road was made directly to the ground without laying a strong foundation. Once it was raining, the soil was washed away and the road sat down. Due to this collapse, the drinking water pipeline that moves through the road is also broken, which also affected the water supply in the area. The well became a problem, traffic happened because of the deep well built between the road, there was a long traffic jam on both sides. In a rabbit, the traffic police reached the place and led the road. The municipal team also immediately investigated the site if the situation is considered serious. The repairs done by the contractor are currently beginning and the contractor has been instructed to ensure that the work must be done again by ensuring the quality of the road. But the question is that when the roads are already before the rain, what will the situation of the city be in the monsoon? Location: Gwalior, Madhya Pradesh Homemadhya-Pradesh 1 month ago the road made 1 month ago, even 1 rain could not carry the rain … 10 feet pit blow the senses!