After Ramlala ‘Ramdarbar’ will now be decorated in Ayodhya, then life will be offered, know the whole program

On January 22, 2024, the statue of Lord Rama is presented in the Shri Ram Temple in Ayodhya. Now after about 1 year, Ram Darbar is established on April 30, 2025, on the favorable event of Akshaya Tritiya. After this, a three -day Great Pran -Pratistha ceremony is held. Champat Rai, secretary secretary of Shri Janmabhoomi Tirtha Kshetra Trust, informed that the ram was set to the first floor of the Shri Ram Temple for the first time. Ayodhya on April 30, in which the idols of Lord Rama, Mata Sita, Laxman Ji and Hanuman Ji will be installed at their designated places in the Sanctum Sanctorum of the Temple. All of these idols are made from Makrana White Marble or Jaipur and now they are being finalized. The idols are decorated with clothing and jewelry. 18 idols will be installed, according to Champat Rai, temples of Surya Dev, Bhagwati, Annapurna, Shivling, Ganesh Ji and Hanuman Ji, will also be built in Ramdarbar Parkota. A statue of Laxman Ji will be installed in the Seshavatar Temple. In addition, idols of Maharishi Valmiki, Vashistha, Vishwamitra, Agastya Muni, Sabari, Ahilya and Nishadraj in SAPTA Mandapam were installed. A three -day Pran Pratistha program is arranged when all trustees meet in June. This includes the supply of drinking water, food, medicine and bed, etc. Four large gates will be built, four large gates are built in the ram -temple. 1- Gate of North Direction 2-Gate 11 3 of Crossing Gate 3 4- The main gate of Ram Janmabhoomi will be named after the four major spiritual traditions of India. This will include the Ramanuja tradition, Shankaracharya tradition, Madhavacharya tradition and Ramanandacharya tradition. This will reveal the symbol of India’s spiritual unity. The construction work of Perkota will be completed by the end of 2025, the construction of the Perkots will be completed by 2025. If it takes two to four months, it is called ‘Rolling Period’. At the same time, the work of the Sheshavatar Temple will be completed to the most important life span. The tower tower in the temple was removed. This means that the Sanctum Sanctorum and internal construction work are now completed. The establishment of peak and punishment is also worshiped, and once the preparations are completed, it will be installed in the top position. Bhujandand also came and now they will be founded after collective worship. Statues of Saints of Prayagraj and Andhra Pradesh will also be installed in the Ram Temple Complex and idols of Saint Purandar Das of Andhra Pradesh will also be installed. In addition, a large statue of squirrels will also be installed, which will show the contribution of the squirrel in the construction of Ram Setu.

Exit mobile version