Aligarh Ghaziabad-Aligarh National Highway will be Sixlane, Foot Overbridge on Ramghat Road
There is only a few hours left that Uttar Pradesh News Desk ends in the year 2022. The new year, ie 2023, is going to be very good from the perspective of infrastructure. Due to the completion of highway construction work and sixty, vehicles will get faster. At the same time, even after the New Flyover formation, the citizens will also get rid of the jam. In addition, the proposal of Ring Road is probably also sealed of the level of management. Aligarh-Ghaziabad Sixlane National Highway No. Number (NH) -91 is in December-2023 between Aligarh-Ghaziabad. It is suggested that this work will be completed for two thousand crore calls by December to 2023. With the formation of sixlane, traffic will become easier. The distance from Aligarh to Ghaziabad is 126 km. The work to make Fourlane was completed in 2014-15. After that it was decided to make it a sixlane. The cube of Singapore works to build the highway. Arnians in Aligarh will be about 40 km from the border to dwarf. Kanpur’s journey will take less time, vehicles will be accelerated on the highway, it takes at least seven hours to go from Aligarh to Kanpur. This is also if you have to travel from the highway through Agra. At the same time, if you want to go directly from Aligarh to Kanpur, take it eight to ten hours. However, this time will be reduced when the work of road building from Aligarh to IIT from Kanpur takes place. In the year 2015 itself was announced that it was a Fourlane. The Aligarh package of this highway is about 45 km. Is part of this work this year. Instead of getting into Aligarh, the bypass is already built to go from dwarf to Agra, Mathura to Delhi. Likewise, Delhi vehicles leave these bypasses for Kanpur and Etah. As a result, heavy vehicles do not have to put in jam. The trip will be easy to smooth Ghaziabad, with the construction of six-len highway and bypass, the movement of Kanpur to Noida, Ghaziabad and Delhi. Currently, traffic pressure on the highway is very high. The jam remains on the route on the route. After the six track, the traffic of Delhi, Noida, Bulandshahr, Aligarh and Kanpur routes will be better. Three flights can be found, in 2023 Aligarh can receive three new flying gifts. This includes Etah Chungi, Quarcy Square and Sarsaullein. All three are included in the busy intersections of the city. People need to get stuck for hours when they are trapped here. People will get relief from the problem of jam by becoming a fly. It will be easy to smooth Ghaziabad, the construction of six-len highway and bypass, Noida, Ghaziabad and Delhi’s traffic. Currently, traffic pressure on the highway is very high. There is a jam on the day in some places on the route. After the six track, the traffic of Delhi, Noida, Bulandshahr, Aligarh and Kanpur routes will be better. Aligarh News Desk shares this story