Pink line work from Lokhandwala to Vikhroli is almost complete, route, station, rent and other information

The Mumbai Metro Line 6, also known as the Pink Line, will give a big boost to the city’s subway network, and is expected to be officially operated by the end of 2026. Eastern West connectivity will be improved with the commissioning of the Mumbai Metro Pink Line of Swami Samarth Nagar to Vikhroli from Lokhandwala, the problem of Passengels will be reduced and the JVLR’s journey will be reduced by reducing the times of passengers 30-45 minutes. Passengers of Andheri, Powai, Vikhroli and Jogeshwari will benefit from this line. Mumbai Metro Pink Line: Route, Station, Rent and Other Details View Mumbai Metro Pink Line is a fully increased passage of fungal Samarth Nagar to Lok Sabha (Eastern Express Highway) from Loka Leline Lokhandwala, which will include a total of 13 stations. The Mumbai Metro Pink line is expected to open by the end of 2026. Wiredock work was completed by 71 percent, while 52 percent of the station’s work was completed. According to News18 report, civil work will be completed by mid -2025. There will be 108 metrocotors on this line, which are 6 coaches. This train will last from 06:00 to 22:00, which will improve the connection before the West. During the busy time on this line, the frequency of trains will be every 5-7 minutes every 5-7 minutes and every 8-10 minutes during the outside pit time. Passengers can travel by smart card or QR code. The tariff on the Mumbai metro-pink line is probably Rs 10 (up to 2 km), Rs 20 (2-5 km), Rs 30 (5–12 km), Rs 40 (12-18 km) and Rs 50 (18-24 km). Mumbai Metro Line 6 Metro Line 2a (Yellow) in Adarsh Nagar, Metro Line 7 (LAL) in JVLR, Metro Line 3 (Aqua) in Sepz Village, Metro Line 4 (Hara) in Kanjur Marg West, Western Railway Line in Jogeshwari and Western Railway Line in Jogeshwari and Central Railway line Kanjur Marg. Share this story -tags