Delhi -Gurugram Expressway: Even after three months of the tender, the names are not visible for recovery - NCR Delhi Gurugram Expressway claims from Saving Lives appeared Hallow
Updated: Mom, 22 Sep 2025 01:12 am (IST) The truth that Nhai lives on Delhi-Gurugram Expressway. There is disappointment among the people because of the non -commitment of work, even after the recovery of the recovery. Broken rails on the highway invite illegal cuts and dilapidated service track accidents. Nhai plans to improve in two years, but currently the condition of the highway is pathetic. Aditya Raj, Gurugram. Nhai claims to be serious about saving life, seems to be completely hollow on the Delhi-Gurugram Expressway. The biggest proof of this is that work is not started in September after the tender was open in June for the recovery of the highway. No date for when the work starts. During October to February, the level of pollution throughout the NCR, including Delhi, increases so many times that construction work is prohibited. In such a situation, an excuse will be made again that the work is slowly as a result of repeated ban on construction work. Remove ad, just read the news, over 30 places Railings Broken Delhi-Jaipur Highway has a 28km share from Expressway from near Dhaulakuan to Kherdoula Toll Plaza. The condition in the Delhi region is very good, but in Gurugram is worse than bad. More than 30 places are broken. In some places, the railing was broken as far as there was no railing facility. Due to the distribution of the railing, people reach the highway from anywhere, it often causes accidents. Not a single entry and exit correctly. The condition of a lot of entrance and exit is that the vehicles are easily released. More than 30 illegal cuts are invited to the accidents that give illegal cuts. Due to illegal cuts, vehicles climb from anywhere on the highway. It not only causes jam, but also fears an accident every moment. The state of service track on both sides of Hero Honda Chowk to Kherkidula Toll Plaza is of such a nature that cannot walk properly. Once it rains, the service track is formed. There are so many wells that there are not known that there are dimples in the Service Lane or the Service Lane in the dimples. The National Highways Authority of India (Nhai) issued a tender of Rs 245 crore a few months ago after the people raised their voice for a long time. The tender was also opened in June. As a result, people hoped that the picture of the highway would start to change now, but even after September 20, the work to change the picture is disappointed everywhere. In this regard, Nhai officials have the same ritual answer that the work will start at the ground level soon. No answer of when it starts. There is no attention to the covering of the drains; There are drains on both sides of the highway to drain the rainwater. Nhai is not even noticed to cover it. There were many accidents due to open drains. Two months ago, a woman fell into a drain near Hero Honda Chowk. He died several times due to head injury. The wheel of a truck full of construction material went to the drain near Narsinghpur. There was a major accident of this. A young man near the Signature Tower Chowk fell into the drain with a bicycle. In addition, there were many accidents. The plan to change the picture within two years plans Nhai to completely change the picture of the highway within two years. According to the plan, the railing must first be restored. After this, the road repair will be done. Service Lane on both sides before Narsinghpur Village is made by RMC (ready -made concrete). Not only that, the Service Lane will be increased. New lights will be replaced by old lights. All access and exit will be corrected. Illegal cuts will be closed. Apart from this, many works must be done. Repair of Rs 200 crore annually Nhai receives an average of Rs 200 crore as a toll annually from the toll plaza operating at Kherkidaula on the Delhi Gurugram Expressway. Experts believe that if 15 to 20 crore calls are also spent each year, there will be no problem on the highway. The condition of the Express seems to have not been noticed over the past few years. To make them aware of the situation of the highway “I go through the Delhi Gurugram Expressway every day. Such a pathetic condition will barely be of any highway in the country. First, it was not necessary to recover for recovery. This work had to be done in the routine. If the tender was started, the condition of Delhi-Gurugram Expressway is of such a nature that the condition of the Delhi Gurugram highway is of such a nature that the vehicle will be afraid at night, where the vehicles also go up. There is a possibility of an accident at the moment. ” – JS Suhag, former technical adviser, Nhai Read -Cyber City will be relieved by ten thousand street lights, will be completed before Deepawali