Demonstration of people who are on request for FOB in Kiradi, residents sent letters to MP by stopping traffic – NCR Nangli residents protest railway wall question

Updated: Wed, 17 Sep 2025 12:08 am (IST) Residents of Kiradi and Premnagar showed the question of an alternative route as a result of the construction of railway walls near Nangloi station. Traffic on baby Vidyapati Marg has been disrupted and demands to become FOB at the MP’s office. The residents also informed the problems caused by the closure of the road. Demonstrations that FOB demands in Kirari. Dialogues Associate, ODD Delhi. After the wall was built by the railroad near Nangloi station, Kiradi, Premnagar and nearby people demanded an alternative route. The protesters stopped the movement of the contact path that led to the surrounding colonies except baby Vidyapati Marg. The movement of the area was interrupted about two hours. After the protest, people reached the MP Yogendra Chandolia office in the Rohini sector-7 and made their claim. Remove the ad, just read the news, in the absence of MP, his representative assured the people that his talk would be sent to the MP. People demanded the creation of FOB (FOOTOVER Bridge) on the railway line. At the same time, the protesters say any alternative arrangement for movement should be made until FOB is ready. Around eight o’clock Tuesday morning, people gathered on baby Vidyapati Marg and demanded to get rid of the problems caused by movement. After the crowd increased, angry people blocked the baby Vidyapati Marg. People who go for their business have also joined this demonstration. People shouted slogans for about two hours. The police reached the place and understood the people and asked them to vacate the road. After this, people sat in vehicles and reached the office of the local MP Yogendra Chandolia in the Rohini sector-7. In the disposal of the MP, his representative spoke to the people and ensured that he had reached the MP. After these people, people returned to their home. Sharada Vals Inclave Rwa member Vikas Rai said that the MP representative was informed about the work of the Footover bridge within 15 days. People say that there are many problems due to the closure of the road. We can’t go work. Children struggle to reach the school.

Exit mobile version