The rejuvenation of Brahmapur-Naininjor road begins, width will double; 24.63 crores will cost

The renovation work of the Brahmapur Naininjor road, the Lifeline or Diara area of ​​the local block began on Thursday. If you keep in mind the increasing population and pressure of vehicles, this time the width of the road is doubled, ie 5.5 meters. Villagers and BJP leader PraFul Tiwari also filed a memorandum with the departmental minister to increase the width of the 3.5 meter road in the past. Until now, this road has been a single lane, which is now being converted into the median cattle. After expanding this road, traffic in the villages of diara will become quite convenient. After expanding the road, the travel time will also be half. Dainik Jagran published news from time to time about the poor condition of this road. The main road of Diara region connecting Bihar and UP is completely broken and converted into a pit. Under the Chief Minister Rural Road Development Scheme, the Foundation Tone was laid by the construction agency at Brahmapur crossing to start the construction work of this road and the construction work began quickly after former BJP -Mandal president Saroj Tiwari broke the coconut. Former Chiefs Kamal Dev Ojha, Sarvdev Tiwari, Rajendra Tiwari, Sri Bhagwan Tiwari, Nityanand Ojha, Vinod Rai, Vikas Tiwari, etc. A total of 24 crore 63 lakh 74 thousand 900 is spent on the construction of 14 km long road from Brahmapur to Nainizor. The people of the Diara region, who have been waiting on the road for a long time, are fortunate to start the construction of road. Share this story -tags