Free Fatmawati 2 Test Trial Information 2, Look at the Schedule!

Jakarta – The Provincial Government of DKI Jakarta applies a free trial for using one left lane at the Fatmawati 2 toll gate for the community. This policy is an attempt to unravel conjunction around the MRT Fatmawati station and JL. TB Simatupang. Look at the following information. Schedule and provisions cited by the DKI Jakarta Provincial Government Instagram account (@dkijakarta), this hearing was applied on Monday – Friday (September 15-19, 2025) at 17.00 – 20.00. This is the provision. Browse to continue the trial content applies to four -wheeled vehicles (not valid for two wheel vehicles and more than four wheel vehicles). One left lane opened without a fee (free), specifically for vehicles to Fatmawati to Lebak Bulus. This is to reduce the density of traffic in Simatupang and its environment. If the five -day hearing has been proven effective, the policy can be extended until October. There has been a trial engineering hearing at TB Simatupang Dishub DKI Jakarta informed that there is a hearing on traffic engineering on Jalan TB Simatupang Simpang Fatmawati -Lebak Bulus segment, South Jakarta. Traffic engineering on the spot runs until September 19, 2025, exactly at 17.00 – 20.00 WIB. These are things that should be known to be related to the implementation of traffic engineering trials on Jalan TB Simatupang. Traffic engineering trials were conducted on Monday, September 1525 to Friday 19 September 2025 at 17.00 to 20.00 WIB. To support the traffic engineering hearing in attempts to deal with the impact of congestion and to reduce traffic conflicts of the Antasari stacking Simpang to the intersection of the Lebak Bulus, the following issues will be performed. To increase the capacity of the road on Jalan Ra Kartini, the southern side (to Lebak Bulus), is the use of one left lane at the Fatmawati 2 toll gate given for free to the offer of the Lebak Bulus toll, specifically for four -wheeled vehicles, for two wheel vehicles or more than four -wheeled vehicles. B. Access from the left lane to the right lane in front of the square ends, the traffic that originally used access to return East East at the Lebak Bulus U-Turn was derived using Ciputat Raya U-Turn before FedEx.c. The closure of the West-West rear before the Fatmawati intersection is derived from the West West Round at the Antasari Susun Simpang. To reduce the traffic density on Jalan TB Simatupang – Jalan Ra Kartini can use an alternative road. The traffic flow from the exit Lebak Bulus direction that the East (Fatmawati) will meet can pass through the Ra Kartini road part -Rotary East East in Your -Turn Lebak Bulus -Jalan Ra Kartini, etc. Traffic flow from the East (Pondok Labu/Cipete/Fatmawati) that will turn the eastern direction of the East can still use U-turn lebak bullus.3. Traffic flow from the direction of Jl. Adiansa, who will be eastern direction (Fatmawati) can pass through the Ra Kartini Road – Simpang Lebak Bulus – Jalan Ra. Kartini -Turn east -oos -fig in U -Turnb Ciputat Raya (before FedEx) -Jalan Ra Kartini, etc. 4. Traffic flow of the West (Lebak Bulus/Pondok Indah) that can turn the West West direction can use you -Antasari.5. Alternative routes for traffic flow from the North (Jl. Pangeran Antasari) and the East Direction (Cilandak/Kampung Rambutan) which will go to pondok labu can go to the Desari – Off Ramp andara Rampan Toll Road – Jalan andara Raya – Turning North -North -Autara direction at the sungai Jalan Jalan Jalan Jalan Jalan Jalan Jalan Jalan Andara Raya – Jalan Margasatwa – Jalan Pondok Labu Raya etc. (KNY/IMK)