GT Fatmawati Trials FREE for the sake of designing traffic jams in TB Simatupang until Friday
Jakarta – The Provincial Government of DKI Jakarta conducts a trial of traffic engineering using one left lane at the Fatmawati 2 -tol gate for free congestion on Jalan TB Simatupang. The trial was intended for four -wheeled vehicles for free until Friday (19/9). “We do a trial until Friday. When the trial phase goes through the road, it will be free,” said DKI Jakarta -Governor Pramono on Monday (9/15/2025). Browse to continue the content, Pramono emphasized that traffic engineering is not only a short -term solution, but also part of the purposeful efforts to be completed in the near future. “I hope that the settlement for Simatupang is not just temporary, long-term, short-term, so I ask that the project carried out by the government could be completed in October. And hopefully it will be completed,” he said. The traffic engineering will be carried out on September 15-19, 2025. The hearing will take place at 17:00 to 20:00. Previously, the DKI Jakarta Transportation Agency (Dishub) will perform a number of traffic engineering to unravel the density on Jalan TB Simatupang Simpang Fatmawati segment, Lebak Bulus, South Jakarta. The application of traffic engineering is valid today. “The community of Jalan Fatmawati that goes to Lebak Bulus, in addition to using the existing road, can also use an extra one of the Fatmawati 2 -Tol gate and free,” said Sunday (9/14), Syafrin Liputo. (Call/Yld)