Himachal: The longest tunnel was prepared on the front between Kiratpur to Nagchala, construction of 280 crores in two years - Himachal Pradesh Kiratpur Nagchala Fourlane Kainchi Mod Tunnel Work Complete Complete Complete Complete Complete Complete Comple
Updated: Sun, 14 Sep 2025 05:22 PM (IST) Himachal Fourlane Tunnel The 1800-meter-long second tunnel is set up in Kiratpur-Manali Fourlane. With the construction of this tunnel in Himachal Pradesh, traffic will be smooth and get rid of the jam. The tunnel is opened within 15 days. The construction of this tunnel cost Rs 280 crore and it was completed in two years. Road Transport and Main Road Raj Minister Ajay Tamta who investigates the tunnel prepared in a scissors on Fourlane. Jagran Jagran correspondent, Mandi. Himachal Fourlane Tunnel, the second tunnel was ready at Kiratpur-Manali Fourlane in the Bilaspur district. The tunnel will be opened within 15 days for the movement of vehicles. The work to build the approach to the tunnel is in the final phases. Remove ad, just read the news, Sunday, the Minister of State Ajay Tamta investigated the tunnel. 280 Crore calls were spent on construction of this tunnel about 1800 meters long. The tunnel is ready in two years. Now there will be no jam, there was movement of vehicles from the same two -lane tunnel. With the construction of a second tunnel with two -lane, the vehicles will now come out of one tunnel, the other. This will facilitate traffic and here will be no jam. Accidents will also be stopped. The longest tunnel between Kiratpur and Nagchala was built by Nhai between Kiratpur to Nachgala, two -lane Five tunnels were built, in which the length of the tunnel of scissors is the highest 1800 meters. The traffic will be very smooth due to the formation of this tunnel. The construction of two more tunnels is proposed to build two track tunnels on the proposed Tehra, Bhawana and two other places. The DPR was sent to the ministry for approval. With the construction of the four tunnels, the route from Nagchala to Kiratpur will be completely ahead. Also read- Himachal: Mla Chandrashekhar, who was quickly death, deteriorated, in support of two more MAs, … 4 conditions will be compromised, Union Minister Duddad Flyover was also investigated, after the disc stunnel was investigated on Sunday morning, Ajay Tamta also investigated the damaged fly and Jhalogi-tunnel in Dhada. He then left for Balichowki in Saraj area. Here he checked the damage caused by the natural disaster. Aut Sainz Luhari Rampur Road inspected. Late that evening, he checked the damaged route from Kullu to Manali.