2 hours travel within 45 minutes! Why is it special for Bangalore's Namma Metro Yellow Line, who inaugurated the Premier Modi; Full Details - Bengaluru PM Modi indented Namma Metro Yellow Line Route Timing Tickt Price details over 8 lakh beneficiaries
Namma Metro Yellow Line details inaugurated Prime Minister Modi inaugurated the yellow line of Namma Metro in Bengaluru, which will connect RV road to Bommasandra. This 19.15 km course, built at a cost of Rs 7160 crore, has 16 stations. This will make access to industrial areas such as Silk Board Junction and Electronic City. 8 Lakh people will benefit daily. The travel time will be reduced to 45 minutes. Digital Desk, Bengaluru. Prime Minister Narendra Modi is today in Bangalore, the capital of Karnataka. Bangalore, called Silicon Valley of India, is also known for long traffic jams. In such a situation, Prime Minister Modi gave a special gift to Bengaluru as a new Metro line. This line of Namma Metro connects RV road in South Bangalore with Bommasandra in the east and will be known as ‘Yellow Line’. PM Modi inaugurated this Metro line today. The 19.15 km course was built at a cost of Rs 7,160 crore, with a total of 16 metro stations. According to estimates, about 8 Lakh people will travel on this new route every day. Video | PM Narendra Modi (@narendramodi) introduces yellow line from Namma Metro in Bengaluru. The traffic congestion is expected to be alleviated with the new Metro line. More than 6 Lakhs passengers will benefit. (Source: third party) and access to industrial area such as Bommasandra will become easier. The homes of most employees of Infosys, BiooCon and TCs are also on this route, which will facilitate them to go to the office. RV Road, 16 stations of yellow line – Ragigudda Jaidev Hospital connected to Green Line – will be connected to the pink line in the future. BTM Layout Central Silk Road HSR Layout Oxford College Hongsandra Kudlu Gate Singasandra Hosa Road Electronic City-1 Konappana Agara Huskur Road Hebbagodi Bomasandra What will be time and rent? The yellow line of Namma metro will be in operation for ordinary people from August 11. This subway will last from 05:00 to 23:00. At the same time, the subway will run every 25 minutes, which is planned to reduce to 20 minutes by next month. The one side price in this subway is up to Rs 10-90. The trip will be completed within 45 minutes, about 8 Lakh people will benefit from the yellow line. It will also help deal with the problem of traffic jams in Bengaluru. Usually it takes one to 2 to 2 hours to travel on this route, but using Metro can be set within 45 minutes. With the green signal of the yellow line of Namma Metro, the basis of Phase 3, PM Modi also laid the basis of phase 3. Work on this route will also begin soon. This 44.65 km route is completed at a cost of Rs 15.610 crore. At the same time, about 25 lakh people will benefit from completing the yellow line.