New Metro Station that will be built in Instalok will now be used in this work - a new metro station will be built in InRalok, a mall will be built on the existing one
The new Metro Station that will be built in Instralok will now be used in this work in the new Metro Station Delhi Metro, the second new Metro Station in Indralok for InstraM-Indrastha Gang in Phase Four from Delhi Metro. It will be part of the green line and will be near the current station. After the new station is built, the current station station will be used. Through this article, the whole news is also in detail. Delhi Metro: Both stations are side by side. Lying Photo Rannvijay Singh, New -Delhi. If a subway gait is being built for the expansion of a subway line, the new station of the same metro line is not being built near the initial station, but the second new metro station will be built in InstraalOK-Indraprastha gait in phase four. It is also when it is part of the green line. For the first time, the process of building a second new metro station near the current station on the same metro line (green line) has started. Metro trains will stop working from the current station of the Green Line in InRalok when the new station is ready and the subway starts to work. The current station and its platform will be used as a mall or buy for business activities. Currently, Green Line stations (Bahadurgarh-Indraralok-Kirti Nagar) and Red Line (Rithala-Shaheed site new bus station Ghaziabad) are already present in Inralok. These two are exchange stations and both stations are side by side. Now in phase four, a new new course of 12,377 km must be built between Indralok to Draprastha. The 1.028 km will be increased and the rest underground. In March last year, the central government approved the construction of this corridor. This corridor is the expansion project of the current green line, but it is not possible to construct the course of the green line due to the green line and the red line station in Indralok. Therefore, the design of the current green corridor near Inralok will also be changed. This is why the Delhi Metro Rail Corporation (DMRC) started the tender process for the construction of new stations, increased corridors, ramps and foot bridges (FOB) for InstrallOk-Enteropra Corridor at Instralok at a cost of Rs 117.16 Crore. DMRC says it is necessary to build a new station taking into account the needs of Metro operations. Later it will be used for direct metro service between Mundka and Bahadurgarh of Indraprastha, the platform of the new Inralok station and the platform of the current station will be used as property development. Every big news from your city will be connected to the current station and a new station Concourse Fob, now on your phone. Download the most reliable companion of Local News Afjagran Local App.