Bihar News Alert: There was a shout in Navagachia, the shore of Ganga was demolished with 70 meters ... Team engineers arrived late at night, the relief started - Bihar News Alert! 70 meter ganga safety ambankment destroyed due to erosion in naugachia bha
Bihar News Alert Ganga is once again in Rate in Bihar. Security Center up to 70 meters in Budhu Chak Village in Navagachiya of Bhagalpur collapsed due to erosion. Once the information was received, the team of engineers reached the place late at night. Rescue work was started. Dialogues, navagachiya. Bihar News Ganga Havoc is broken again on Ismailpur Bintoli -Wal. Late Sunday night, near the Budhu Chak village Ismailpur bin Toli -Wal, near the fish in near the fish Arat, the shore collapsed 60 to 70 meters in the length of the shore. Due to this erosion, most of the shore merged into the river. After receiving the information from the Department of Water Resources, executive engineer E. Gautam Kumar, assistant engineer Amitesh Kumar, junior engineer and Gopalpur police station Mithilesh Kumar reached the place and began the work of erosion. Remove the advertisement, just read the news, with the help of locals, the power department was notified and the power supply was discontinued, so there is no accident in the field of erosion. Because of this erosion, one or two poles electricity also fell into the river. The engineers tried to stop erosion by cutting bamboo rolls and tree shrubs. However, some residents have expressed resentment by slowly seeing the progress of the work. The assistant engineer on the spot said there is an erosion between 50 and 70 meters in the shore and that we are trying to stop it. He said the pressure was left near the fish due to the backwater of the river. We try to stop erosion through separate Jio bags, etc. The president of the police station tried to calm the locals and advised them to go to a high place. There was also information about the increase in the water level of the Ganges River, which could make the situation more serious. The incident presented a challenge for the local administration and the Department of Water Resources. There is a need to take immediate steps to ensure the safety of the shore, so that such incidents can be avoided in the future. All departments involved must work together for the safety of locals and the strengthening of the shore. These types of incidents not only pose a threat to locals, but can also negatively affect the economic condition of the region. Therefore, the administration must regularly monitor the condition of the embankment and make the necessary improvements on time, so that such problems do not face in the future. The Department of Water Resources came in a warning mode due to the increase in the water level of the Ganges, the water level of the Ganges River in the water level of the Ganges River in the coming days in the coming days. According to the information, the Ganges River is currently flowing above the danger mark. Due to the possibility of increasing the water level of the Ganges River, the flood control Division Office improves through Bambo resin and sand -filled bags on all sensitive tracks and banks of different contractors. The damaged part of the shore in two hundred meters between the number eight and nine is currently restored. But due to the stopping done in many places, sandbags are taken immediately due to the river mockery. Assistant engineer at the Camp Office in Spar No. Six N. Amitesh Kumar, said the situation is currently under control. On the instructions of the senior officials, one lakh fifty thousand sandbags are stored for emergencies. So that as the water level increases, the work of the embankment and tracks can begin immediately. The possibility of raising the water level of Ganga in Kahalgaon from today is expected to increase in Kahalgaon in the water level of Ganga from Monday. The water level of the Ganges is currently 12 cm above the danger mark. According to the Central Water Commission, the water level of the Ganges was recorded at 31 meter 21 centimeters on Monday. The water level has dropped by one centimeter over the past four hours. However, the water level is expected to rise from Monday. The diara area of the Ganges and the crossroads are still underwater, while the floodwater came from other places.