The municipal corporation is investigating buildings at poor structures in Mustafabad area in East Delhi. So far, 38 houses have been marked that will be issued soon and the sealing of the sealing will be done. There is an atmosphere of fear among the people, as many floating buildings are in a rough state. The incomplete drainage construction also weakens the basis of buildings. Jagran correspondent, East Delhi. Four to six -story buildings built on a poor structure in Mustafabad area are identified. The municipal team investigated 23 such houses here on Monday. A total of 38 houses have been marked so far, which will soon be notified. Thereafter, the sealing will be recorded. Surprisingly, such houses were not placed in this category on iron pillars and corners. In such a situation, the survey is questioned. After the house collapsed with three floors in Dayalpur Shakti Vihar Gali Gali number in Mustafabad, the team of the municipal corporation building department began the recording of Sunday. On the first day, 15 weaker houses, which were four to six floors, were marked. Under this survey, the team sees whether there is a pillar in the houses or not. Whether the ground floor structure has the ability to carry more weight. Under this survey, the corporation team went to different streets of the area on Monday and questioned 23 houses by evening. The corporation’s press and information directorate said that so far a total of 38 buildings have been done. This work will continue even further. Those identified will first give notice. Thereafter, the sealing will be recorded. The people of the area are nervous at the beginning of the survey in the area. Especially those whose homes have become a lot of floors and look from the outside. To save from the survey of the survey, the people around the public representatives travel. The work of drains is incomplete, a letter written by local councilor Arun Bhati on Monday by the poor corporation established with water. A complaint of the locals under It is also attached. In it it was written to complete the unfinished construction work of the drain and road in street number one. People said in their complaint that Dsiidc Messrs. Naresh Kumar Aggarwal gave the task of making out and making way here, which they have not yet completed. As a result, the water of the drain is weakened by them. With this letter, the corporation tries to form the basis to save its JE. Every big news from your city, now on your phone. Download the most reliable companion of Local News Afjagran Local App.
Preparations to demolish the poor building in Delhi, 38 houses identified so far in this area; Panic among people – Poor buildings in Delhi 38 structures identified for demolition
