As a result of the demonstration, the traffic Jalan Gatot Subroto is closed towards Simpang Kuningan
Jakarta – A number of masses solved from the front of the parliament building have survived at a number of points. Police officers are trying to spread and the masses are on the crowd. The impact of chaos in attempting to solve the masses, a number of affected roads. Jalan Gatot Subroto in South Jakarta (South Jakarta) is temporarily closed. “The traffic situation JL. Gatot Subroto South Jakarta in the direction of Simpang Kuningan is temporarily closed,” said TMC Pansda Metro Jaya said in the x @tmcpoldametro account, Thursday (8/28/2025). Browse to continue the content, the news was delivered by TMC Pansda Metro Jaya per 18.54 WIB. The uploaded photo is seen that the entire road body is full of vehicles ranging from motorcycles, cars, to buses. Meanwhile, various conditions in the Tol Road in the city of Jakarta have on the side of Jalan Gatot Subroto. Toll in the city can be crossed by vehicles. “For the time being, there is no distraction from the inner toll road in the city, GT Semanggi 1 -way in Kuningan and it is observed that vice versa is busy smoothly,” he said. To note, the masses were hit from the front of the MPR/DPR building. The masses were then spread to Pejompongan to Asia Africa, Senayan and around Palmerah. The closure was also performed on Jalan Pejompongan, Jalan Palmerah Timur, Jalan Palmerah Utara, and part of Jalan KS Tubun. The streets are around the MPR/DPR building. (Jbr/yhas)