Now there will be no jam in Varanasi, know where the flying ability will be built, roads will also be wide
There will be no jam in Varanasi, now know where the overalls will be built, roads will also be widely updated: April 13, 2025, 21:19 IST Varanasi News: According to the report, the overtake will be prepared for the beggar. This overlay will start from Bareka Gate and end on the Chitipur route. People will not get a jam due to new fly in Varanasi. Highlights in Varanasi, two new overcomers will be built in Manduwadih and Bhikharipur Tirahe. The Flyover Prime Minister Modi will lay the foundation stone Varanasi: the pressure of vehicles is increasing in Varanasi city Uttar Pradesh, which has to stare at many main roads. But now the situation is going to change. Because along with the expansion, preparations began to build an overtake. There will be relief from the jam on the road from Lahartara in Varanasi to Bhu and Bhelupur. Because through Sundarpur, this whole road will grow and two new major flights will be built. The first flower will be prepared at the intersection of Manduwadih and the second flower will be prepared at Bhikharipur Tirahe. In addition, a service path will also be built on both of this overlap. So that the locals can find an alternative way of movement. According to the proposed Media Report of Rs 476.41 crore, the overflow that will be prepared on Bhikharipur Tirahe will be shaped. This overlay will start from Bareka Gate and end on the Chitipur route. During this construction work, the temple located at the intersection will be decorated. Prime Minister Narendra Modi will lay the ground stone of both flying origin. A revised budget of Rs 476.41 crore has been drawn up for the development of this entire route. Fourlane will be the way from Lahartara to Vijaya Mall, who goes through Manduwadih, Sundarpur, Naria Tiraha, Lanka Square and Ravinduri Colony. Now it will be completely ahead. People have to struggle with three to five hours of jam at Manduwadih intersection for some time every day. According to the information received, this overtake will be ready for Rs 56.73 crore, the overtake that will be built at Manduwadih intersection will be 342 meters long. It starts about 125 meters before the intersection and ends before the gate of Banaras station. This overlay will be prepared at about 56.73 crores. There will also be a 5.5 meter wide service track on either side of it. In addition, Eleveed Road will be built from the Gate of District Education and Training Institute to Ring Road in Sarnath. This will complete the journey within three minutes. First published: April 13, 2025, 21:19 IST Homeuttar-Pradesh will not be stuck in Varanasi, know where the flying ability is built, the road will be expanded