Muzaffarpur Govt School: The roof of a school in Saraiya falls and falls, despite the fact that the administration is not doing any work - Muzaffarpur Govt School falls down the roof of a school in Saraiya
Kitne Surakshit Hain School School Saraiya Block’s Prophet for Higher High School, even after gaining higher secondary status, the building was not built. As a result, children who are enrolled here are studying in a dilapidated building. As a result, there is always a fear of accident. Parents are concerned about their safety instead of children’s education. Manoj Kumar Rai, Saraiya (Muzaffarpur). Muzaffarpur Govt School Infrastructure / MuzaffarPur School Building Condition: First received the status of secondary and now higher secondary status, but the school foundation did not pay attention to the school foundation. Higher secondary education would be arranged at the Panchayat level, the quorum was completed. No one is worried about where the children are going to study. The roof of the old dilapidated building falls on the day. It is a fact that the authorities do not hear the threat of it. It is the greatest pain of the Prophet, higher secondary school of Saraiya Block, which runs into the dilapidated building. Children are forced to study by risking their lives. The dilapidated building invites the accident. An indefinite incident can happen at any time. Teachers and students are always panicked. The issue of drinking water and toilet facilities is meaningless. It is said that the school building could not be built in 2013 due to the controversy over the Battle of dominance and contract. 22 Lakh calls were returned. The result is that the school runs in half the old tile house. The thatched roof of the remaining part flew. In addition, there is another pucca building of three rooms in the school grounds, but its condition is also bad. In the rain, water drips off the roof. The roof fell into some parts. The remaining plaster falls. If the roof falls and falls, it cannot be said. The school does not have enough room to hide the head, but 300 children are entered from class one to eight. There is an entry of 18 children in the inter. The school, which originated in 1972, has ten teachers for class one to eight. 300 children are taught in just three rooms. No resources of child sports are available. The irony is that after the status of the inter -level school got school, not the placement of the teacher or the system of the classroom was done. The department is written against the problems of the school. Correspondence was also done for the construction of the construction. Attempts are used from school level for basic facilities. Public, principal (financial costs)