Ammonia leakage in Bikaner's Ice Factory, Manager's Health

Ajnia Gas Leakage at Rampuria Ice Factory near Bikaner’s Light House has panicked among the people living in the area. Women and children moved from their homes to safe places. Due to nervousness, the health of the factory manager also deteriorated and he also had to be taken to PBM Hospital. The leak was controlled within an hour. It is difficult to breathe on Wednesday (April 16), a sudden leak and smell of smell at the Waterkerdensor of Rampuria Ice Factory in Vinoba Basti near Roshni Ghar. As a result, the eyes of the people around began to burn. People living in this area have suffocated. Due to the spread of terror, anarchy spread in a population of about 5 thousand. Many homes in the area have become empty. People in the area said that the smell of gas spreads quickly due to the direction of the wind. A major accident was averted due to the vigilance of the administration. The factory was erected in 1944. Now it went into a densely populated area. Sadar police station reached the place as soon as the information was received. The news of gas leak stirred the administration. Tehsildar, food safety officer and factory teams and cuisine have reached and investigated the factory. A major accident was averted due to the vigilance of the administration. The gas leaked for about 45 minutes. Water pool condensor is installed in ice cream factories to cool water and make ice cream. It is a type of pipe in which ammonia gas and water flow. The gas began to leak at full pressure due to the bars of a gasket in the condensics valve at Rampuria Ice Factory. The gas leaked about one and a half hours. At the time, the factory manager went out, and an employee present, called the engineer of a private dairy cooling plant to repair the valve. There is also no security system in the factory. The equipment was not inspected for two years. Several defects were also found in the investigation of Rampuria Ice Factory. The equipment of Rampuria Ice Factory is not inspected for two years. According to the rules, the equipment must be inspected by an authorized engineer each year and obtain a stability certificate. But the factory’s trading license has not been renewed for one year. Share this story -Tags