700 km long highway will be built in Uttar Pradesh. These districts will benefit

The 650 km Lange Shamli-Gorakhpur Expressway proposed as a Greenfield gait will be built in 11 packages. Puwaan will be developed as an important connection to Shahjahanpur. To ensure that the project is completed in the shortest time, the detailed project report (DPR) of the highway is prepared in two parts. This highway will connect Nainital Road and Pilibhit Road into Bareilly. This action plan has been corrected after several round meetings with consultants in Bareilly. In the meeting held in the presence of the headquarters officials, the alignment of the highway was proposed. The initial agreement was reached on the three configurations. Separate DPRs are prepared for all three. A counseling firm has also started a survey to find out how many bridges, bridges and flight reports are needed. One of these will be completed. After this, the National Highways Authority of India (Nhai) will begin the process of land acquisition by administration in different districts. According to officials, the highway will be built in two parts. In the first part, the distance from Shamli to Puwaan is about 350 km. Its construction is represented in six packages. In the second part, the distance from Puwaan to Gorakhpur is about 300 km. It will be made in five packages. Different advisers work for both parts. Nhai plans to start with construction work of Gorakhpur and Shamli as well as Puwaya. The construction work is expected to be completed in three years. This highway will connect these districts. Shamli to Puvaiya: Shamli, Muzaffarnagar, Moradabad, Rampur, Bareilly, Pilibhit, Shahjahanpur. Puwaan to Gorakhpur Shahjahanpur, Lakhimpur Kheri, Bahraich, Shravasti, Basti, Gorakhpur. In this part, the areas around the Nepal border take precedence. This will pave the way for the development of the border districts. It is possible to increase up to six lanes. Right now, the Shamli-Gorakhpur highway is made a four-course highway. This can be expanded up to six jobs according to future needs. Nhai will acquire land according to this scheme. All downfall and overlaps will only be built six lanes. The work to lay the railway between Shamli and Puwaan is underway. It will ensure that Bareilly gets the full advantage of the highway. Shahjahanpur and Lakhimpur Kheri will also benefit greatly from this highway.