Updated: Sun, 19 Oct 2025 07:19 (IST) Ghaziabad Development Authority (GDA) has taken steps to ensure the strength of the flats constructed under the PM Awas Yojana. GDA vice president ensured that the quality control and repair of the apartments. A dedicated team will inspect the buildings regularly. This step will provide relief to apartment dwellers and they will get safe accommodation. Jagran Correspondent, Ghaziabad. The allottees have not yet got the possession of the residential buildings under the Pradhan Mantri Awas Yojana (PMAY), but before that the authority is preparing a plan to overcome the problems. There is a plan to determine the maintenance costs for the awards during the registration itself, taking into account the area of the building and mentioning it in it. Remove advertisement Read-only news Recently, GDA president dr. Hrishikesh Bhaskar Yashod instructed to fix maintenance charges for better maintenance of PM’s residence and to avoid possible problems in future. So that regular maintenance of the buildings provided to the allotments can be ensured. Atul Vats, vice president of the GDA, said that the registration process will be completed before the building is handed over to the allottees. Along with this, the monthly maintenance fee for the allocations will be fixed in the register after being assessed according to the area of the building. The quality of the allotted buildings will be maintained by carrying out maintenance as per requirement from time to time. As a result, residents will not have to face any problems from now on. Tulsi Niketan will fall into disrepair due to lack of maintenance. Due to the non-maintenance of PM Awas Yojana buildings taken out by lottery for low and low income group people, many buildings have reached a dilapidated condition within a short time. Tulsi Niketan by GDA is a living proof of this. GDA established this colony in the year 1990 by constructing 2004 EWS and 288 LIG flats in around eight acres of land. After the allocation of the flat, people have not repaired the building from time to time, which is planned to be razed to the ground and make a multi-storey building. To ensure that such cases do not recur, GDA has drawn up a plan for maintenance.
The tension of flat awards will go away, GDA has taken a big step regarding PM’s residence; Strength of buildings will remain intact – gda action pm awas yojana flats to get power check allottees relief
