This National Highway from UP will be rejuvenated with Rs 1023 crore, will be 12 meters broadly – Nandaur Khalilabad Nyori National Highway Breating Project approved in Sant Kabir Nagar

Sant Kabir Nagar News | Up News | The Nandaur-Khalilabad-Nnyauri National Highway (328a) will be expanded in Sant Kabir Nagar. A DPR of Rs 1023 crore was sent to the central government. The road is 7 meters to 12 meters wide, which will benefit the people of many districts and get rid of the jam. There is a plan to make it a Fourlane in the future. Atul Mishra, Sant Kabir Nagar. The National Highway Nandaur Khalilabad Nyori (328a) will be expanded. For this, a DPR of a thousand 23 crore calls was prepared and sent by the executive engineer NH Basti to the Union Ministry of Road Transport. After getting approval, the path of upgrading the road will be cleared. With the erection of this road, people from many districts will gain the benefit of the comfort of traffic. It is proposed to make Nandore Emphylabad Nyori 62 km long national highway 12 meters wide instead of 7 meters. With this, many vehicles can come face to face at the same time. Due to the rejuvenation of this road, many other intersections, including Bakhira, Baghauli, Khalilabad, Dhanaghata, will also be developed. Apart from Sant Kabir Nagar, the road construction will be able to facilitate the movement of people of Ambedkar Nagar, Siddharthnagar and Basti. The problem of jam per road will also be completely eliminated. There is a preparation to make this national highway a Fourlane in the future. The department concerned started to work seriously. The project is expected to end up on the country soon. Along with the expansion of two bypass national highways to be built in Khalilabad and Ramnagar, a proposal to bypass in two places in Khalilabad and Ramnagar is also included in the DPR. Bypass construction will also solve the problem of jam. In some other places, churning continues to remove the bypass, but it has not yet been agreed. The Infrastructure National Highway will be prepared according to the trout. But according to the foyer, its infrastructure will be prepared in the construction of bridge, and others. So there is no problem making trout in the future. It is more likely that this road is transformed into a trout. Gazette can be released soon for land acquisition; Soil must also be obtained in many places in the expansion of the National Highway. For this, the department is preparing to make it look at it soon. After the Gazette is released, the future situation of the road can be measured in a better way. The DPR for the expansion of Nandaur Khalilabad Nyori National Highway was prepared and sent to the government. After getting approval, the way for widening the road is cleared. There is a possibility of an estimated cost of a thousand 23 crore calls. The department is considering all aspects seriously. Sandeep Verma, Executive Engineer, NH, Basti.

Exit mobile version