Up: Three e-load stations ready in Greater Noida, 12 electric vehicles are loaded simultaneously

Greater Noida, September 22 (IANS). Another achievement was added to Greater Noida. Three loading stations were ready for the first time in Greater Noida. These loading stations were built near City Park, Gniot at Knowledge Park and near the University of Sharda. The new loading stations also facilitated the loading of electric vehicles to the UP International Trade Show. All three loading stations are permanently prepared, so that electric vehicles will be charged even after the trade show. Electric vehicles owners became upset for the levy due to a lack of e-loading station in Greater Noida. A large number of electric buses have been installed in the trade show to bring passengers to the destination. There was a challenge regarding their levy. NG Ravi Kumar, CEO of Greater Noida Authority, instructed to prepare the levy station before the UPITS 2025 began. Under the supervision of Aceo Prerna Singh, the Department of Urban Service of the Authority began the work of the e-load station in three places in collaboration with NPCL. All three loading stations are now ready. The levy of vehicles has begun at all three loading stations near Gniot and Sharda University in City Park in Greater Noida, Knowledge Park. In Greater Noida, vehicles that buy electric vehicles have received the facility to load electric buses and other vehicles in trade shows. This will promote electric vehicles in Greater Noida. Prerna Singh, Aceo of Greater Noida Authority, said he should build more loading stations according to the requirement. -Ians PKT/SCH Share this Story Tags