Last updated: 07 June 2025, 22:35 IST Delhi Metro News: Tunnel Boring Machine on Delhi Metro Golden Line made a historic breakthrough. The 792 meter long tunnel was prepared from the earth pressure balance flaid without damaging the surface. The echo of development in the tunnel during the historic breakthrough of the tunnel -switching machine on the Delhi metro -gold line. (Photo News18) Highlights TBM exposition on Delhi Metro Golden Line. The tunnel -swallowing machine built a 792 -meter tunnel. EPBM technology has made tunnel construction safe and durable. New -delhi: Friday was historical for Delhiites. The country under the Tughlakabad trace colony trembles, but not with fear, but with the speed of development. Under the Delhi Metro Phase 4 project, the Tunnel Boring Machine (TBM) on the Golden Line successfully brought a new dimension to the underground metro connection of the capital. Dr. Transport Minister Pankaj Kumar Singh was present at this historic event. He took the work in the tunnel and participated in the TBM breakthrough process with the Tunnel team. On this occasion, Dr. Vikas Kumar, managing director of DMRC, and many senior engineers also present. What is TBM breakthrough and why is this great achievement? Tunnel boring machine is a special machine that makes long tunnels underground without damaging the surface. This time, TBM successfully cuts the 0.792 km tunnel, one of the two parallel tunnels. Metro trains will run here. Breakthrough is expected in the second tunnel until July 2025. This tunnel was built at about 18 meters depths and 566 before -peric concrete rings were used. They are prepared for the modern casting yard in Mundka. The tunnel is built at a depth of about 18 meters. (Photo News18) How to get safe and durable? Earth pressure -balanced method (EPBM) technique was adopted in excavation. This technique is considered for accuracy and safety. DMRC monitored the sensors on the movement of nearby buildings throughout the tunling. The result was that neither the land nor any loss occurred in the entire campaign. Hard work Minister Dr Pankaj Singh said it was not only the victory of engineering, but the result of the center partnership and the government of Delhi. Major infrastructure projects in Delhi gained momentum in Delhi under the vision of Prime Minister Narendra Modi and Chief Minister Relha Gupta. This will connect the southern part of Delhi to IGI Airport. (Photo News18) He further said: “The public’s confidence is back to our government. The first projects that have been crashing into the files for years are now moving quickly to the ground. This breakthrough is a symbol of new energy and speed.” This line will change Delhi’s Surat phase-4, a total of 65,20 km of new lines in Delhi metro, of which more than 40 km will be underground. The Golden Line (Tughlakabad -Arocity Corridor) is the most important link. This will connect the southern part of Delhi to IGI Airport. Engineers received the honor, the minister met the team that works in the tunnel and encouraged them. He said: “The DMRC team has proven again that when the intentions are strong, the road also comes under the rocks.” About author Sumit Kumit Sumit Kumar works as a senior sub editor in News18 Hindi. He has been associated with the Central Desk team for the past three years. He has a master’s degree in travel. Before working in News18 Hindi, … Read more Sumit Kumar works as a senior sub -editor in News18 Hindi. He has been associated with the Central Desk team for the past three years. He has a master’s degree in travel. Before you worked in News18 Hindi, … Read more location: New -Delhi, Delhi Homedelhi Historic TBM Breakthrough on the Delhi Metro -Gold Line, What is it?