Indian Railways time table 2026: Speed of 549 trains increased, 122 recent trains introduced, 86 trains extended... What does TAG mean?

Indian Railways time table 2026: Speed of 549 trains increased, 122 recent trains introduced, 86 trains extended... What does TAG mean?

Home BusinessIndian Railways time table 2026: Speed of 549 trains increased, 122 modern trains introduced, 86 trains extended... What does TAG mean? Indian Railways time table 2026: Speed of 549 trains increased, 122 fresh trains introduced, 86 trains extended… What does TAG mean?

The 122 fresh trains introduced under TAG 2026 include a mix of premium, express, and passenger services. Among these, 26 Amrit Bharat trains were introduced, including 4 trains via TAG-TOD

Published date india.com

Published: January 11, 2026 11:04 AM IST email india.com By Sumaila Zaman email india.com twitter india.com | Edited by Sumaila Zaman email india.com twitter india.com Facebook india.com twitter india.com telegram india.com Follow Us india.com Follow Us Indian Railways time table 2026: Speed of 549 trains increased, 122 new trains introduced, 86 trains extended... What does TAG mean?

With the implementation of the “Timetable of Trains TAG 2026,” Indian Railways has made some substantial enhancements that will lead to faster trains, improved on-time performance, and better overall performance. Overall, under TAG 2026, 122 novel trains were introduced, 86 trains extended, 8 frequency increases, 10 trains converted to superfast, and 549 trains speeded up across Indian Railways.

Why has the speed of 549 trains been increased under TAG 2026?

The 122 recent trains introduced under TAG 2026 include a mix of premium, express, and passenger services. Among these, 26 Amrit Bharat trains were introduced, including 4 trains via TAG-TOD. “The highest share comes from Mail/Express trains with 60 services, of which 8 were introduced via TAG-TOD. In addition, 2 Humsafar trains, 2 Jan Shatabdi trains, 2 Namo Bharat Rapid Rail services, and 2 Rajdhani trains were introduced,” Ministry of Railways in its press release remarked.

In the Central Railway (CR) zone, 4 new trains have been introduced, 6 trains extended, and 30 trains speeded up. The East Coast Railway (ECOR) has seen the introduction of 4 innovative trains, extension of 4 trains, and 3 trains speeded up. The East Central Railway (ECR) recorded a significant expansion with 20 new trains introduced, 20 trains extended, and 12 trains speeded up. In the Eastern Railway (ER), 6 latest trains were introduced, 4 trains extended, and 32 trains speeded up.

The North Central Railway (NCR) introduced 2 fresh trains, extended 4 trains, increased frequency of 2 trains, and speeded up 1 train. The North Eastern Railway (NER) added 8 fresh trains, extended 4, increased frequency of 2, and speeded up 12 trains. As per the press release published by the Ministry of Railways, the Northeast Frontier Railway (NFR) introduced 10 novel trains and speeded up 36 trains. The Northern Railway (NR) introduced 20 fresh trains, extended 10, and speeded up 24 trains, while the North Western Railway (NWR) added 12 innovative trains, extended 6, increased frequency of 2, and speeded up 89 trains.

Add India.com as a Preferred SourceAdd India.com as a Preferred Source

The Southern Railway (SR), introduced 6 latest trains, 4 extended, 2 converted to superfast, and 75 trains speeded up. The South Western Railway (SWR) introduced 8 novel trains, extended 6, converted 8 to superfast, and speeded up 117 trains, the highest among all zones.

The West Central Railway (WCR) introduced 8 novel trains and 27 trains speeded up. The Western Railway (WR) introduced 10 recent trains, extended 10, increased frequency of 2 and speeded up 80 trains.

Under TAG 2026, the speed of 549 trains was increased, and, therefore, it is now much more likely that trains will arrive at their destinations on time. Out of these,

376 trains were speeded up by 5 to 15 minutes 105 trains by 16 to 30 minutes 48 trains by 31 to 59 minutes 20 trains by 60 minutes or more

Further, 28 Vande Bharat trains were added to enhance semi-high-speed connectivity. Altogether, these categories account for the majeur total of 122 novel trains introduced during the period.The South Western Railway (SWR) led with a major contribution, including 66 trains speeded up by 5–15 minutes, 29 by 16–30 minutes, 12 by 31–59 minutes, and 10 by 60 minutes or more. The Central Railway (CR) speeded up 13 trains by 5–15 minutes, 13 by 16–30 minutes, and 4 by 31–59 minutes. The East Coast Railway (ECOR) speeded up 2 trains by 5–15 minutes and 1 train by 16–30 minutes. The East Central Railway (ECR) speeded up 7 trains by 5–15 minutes, 2 by 16–30 minutes, 2 by 31–59 minutes, and 1 train by 60 minutes or more. The Eastern Railway (ER) recorded improvement with 29 trains speeded up by 5–15 minutes and 3 trains by 16–30 minutes.

About the Author

Sumaila Zaman

Sumaila Zaman

Sumaila Zaman is a Senior Sub Editor at India.com, where she covers key developments and trending events across education, world affairs, business, and current reports. At India.com, she specializes in b ... Read More

twitter india.comlinkedin india.comlinkedin india.com

Also Read:

Article Image

THIS is India's only free train where passengers don't need a ticket to travel, runs from..., its name is..

Article Image

China achieves another breakthrough as its train reaches insane speed of 700 km/h in just 2 seconds, sets World Speed ​​Record; WATCH VIDEO

Article Image

1 paise per km in Ordinary Class, and 2 paise per km....: Train tickets to get costlier as Railway announces fresh fare structure, to be effective from...

For breaking reports and live reports updates, like us on Facebook or follow us on Twitter and Instagram. Read more on Latest Business News on India.com.

Topics

Indian railwayrailwaytrain

More Stories

Read more

View Original Source