There is maintenance, Leuwiranji Bridge Bogor is closed until December 31

Jakarta – The Bogor Regency Public Works and Spatial Planning Service (DPUPR) is carrying out maintenance on the Leuwiranji Bridge. The bridge connects Rumpin district with Mount Sindur. “During the work period, there will be a total closure of the Leuwiranji Bridge from December 13 to December 31, 2025,” said Bogor Regency DPUPR Secretary Gantara Lenggana on Saturday (13/12/2025). Scroll TO CONTINUE CONTENT He said the maintenance was carried out to maintain security, comfort and smooth mobility. The budget spent amounted to IDR 4.8 billion. “The maintenance process was carried out for 1.5 months with a total budget of IDR 4.8 billion,” he explained. Gantara said the work was carried out by a third party with full supervision from his party. Supervision is carried out to ensure that the quality of work is appropriate. “For this reason, we appeal to the public to use alternative routes during the closure period,” he said. Gantara said he would strive to ensure that the project could run on time. So that the mobility of road users can return to normal. (rdh/moa)

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *